- Export to PDF
- Favorite
ALG-6200/2
Filter Details
| Filter Type | Fuel |
Dimensions (mm)
| E-Weight | 0.24 |
|---|---|
| C-Overall Diameter - C | 70.0 |
| H-Hight | 111.0 |
| E-Inlet | M14x1.5-6H |
| F-Outlet | 11 mm |
| Filter Type | Fuel |
| E-Weight | 0.24 |
|---|---|
| C-Overall Diameter - C | 70.0 |
| H-Hight | 111.0 |
| E-Inlet | M14x1.5-6H |
| F-Outlet | 11 mm |